## Summary
Is it possible to decide what rpe should be considered for the E1RM? Sometimes I have a 6-7rpe that I don't want to be "ruin" the e1rm
## Context
Page:
/session/520ff9b0-26f8-4aa8-acf1-5be2e2340d67?date=2026-07-12
## Problem
Is it possible or is it design to take onto consideration rpe from 6 to 10 for a correct estimation?
## Proposal
Maybe a feature where you can decide if you wanna consider those sets for 1erm or no. (For ex. The deload sets maybe are a 7rpe because of fatigue but shouldn't be considered for an estimated 1RM
## Expected Impact
Maybe a more accurate estimated 1rm and so the number of kilos on the bar advised for the sets